TGTU PACKAGE
Heat recovery for the Tail Gas Treating Unit.
Combustion chamber and waste heat boiler for the tail gas section of the sulphur block.

74 kg/cm²
490°C steam
55+ units
20+ installations
What it is
A tail gas treating unit takes the gas leaving the Claus reactors and recovers the last of its sulphur before the incinerator. Its front end is a combustion chamber, where tail gas is heated or partially combusted to the reaction conditions the licensor specifies, and a waste heat boiler that cools the gas and raises steam. We supply the two together, engineered to the licensor's basis, in the same modular construction as our MCC and incinerator packages.


How we build it
- Combustion chamber with refractory lining and burner interface
- Waste heat boiler, fire-tube or water-tube, with protected tube inlets
- Steam drum and circulation to the unit's steam conditions
- Materials and tube temperatures chosen for sulphur-bearing gas
- Modular construction for site assembly; built under ASME U and S stamps

